remove uneeded dependency and test with 9.0.1 and 9.1.0 in github #4122
Annotations
3 errors
|
Build (rocq/rocq-prover:9.1.0-ocaml-4.14.2-flambda)
Process completed with exit code 20.
|
|
Build (rocq/rocq-prover:9.0.1-ocaml-4.14.2-flambda)
The strategy configuration was canceled because "build.rocq_rocq-prover_9_1_0-oc" failed
|
|
Build (rocq/rocq-prover:9.0.1-ocaml-4.14.2-flambda)
The operation was canceled.
|