Notifications
You must be signed in to change notification settings - Fork 33
ENA - perform full-up end-to-end mapping test #2774
Copy link
Copy link
Labels
Ins: GLOWSRelated to the GLOWS instrumentRelated to the GLOWS instrumentIns: HiRelated to the IMAP-Hi instrumentRelated to the IMAP-Hi instrumentIns: LoRelated to the IMAP-Lo instrumentRelated to the IMAP-Lo instrumentIns: UltraRelated to the IMAP-Ultra instrumentRelated to the IMAP-Ultra instrumentPhase E: Parent IssuePhase E major task indicatorPhase E major task indicatorPlannedTasks originally committed for the monthTasks originally committed for the month
Milestone
Metadata
Metadata
Assignees
Labels
Ins: GLOWSRelated to the GLOWS instrumentRelated to the GLOWS instrumentIns: HiRelated to the IMAP-Hi instrumentRelated to the IMAP-Hi instrumentIns: LoRelated to the IMAP-Lo instrumentRelated to the IMAP-Lo instrumentIns: UltraRelated to the IMAP-Ultra instrumentRelated to the IMAP-Ultra instrumentPhase E: Parent IssuePhase E major task indicatorPhase E major task indicatorPlannedTasks originally committed for the monthTasks originally committed for the month
Type
Projects
Status
Todo
Experience with the in-situ instruments has shown that, even when validated with flight data, small issues tend to crop up when deploying into production and trying to flow data from L0 through L3.
The expectation is that the map products will likely have a similar process to go through, and so we should deploy the map codes into production and trigger processing before the planned generation of the first three-month maps "for score". The plan is to generate all maps, even those that are normally only produced on a longer cadence (there will just be a lot of gaps).
This is the list of needed inputs / preconditions, to be replaced with GH blocking issues--i.e. once an issue is identified and added as a blocker to this one, the related item on the list is removed, so we only have it in one place: