Workflow: Mark Completed and Verify Implementation

Purpose

Inspect the codebase and verify that all reported completed tasks were actually implemented. Mark truly completed tasks and sub-tasks with green check marks (✅). Flag instances of false reporting (incomplete or not done) so the developer can decide what to do. Reconcile and update related documentation, changelog, and troubleshooting logs.

When to Use This Workflow

Use this workflow when:

  • A plan or implementation report claims tasks are "complete" and you need to confirm they were actually done
  • Before closing a milestone or marking a plan as finished
  • After a code review or refactor to ensure checklist items match reality
  • When reconciling plans (e.g. project/build/*.md) with project/changelog/, project/troubleshooting/, and docs/

Use 02-sync-documentation.md instead when:

  • Documentation is outdated but there is no "completed task" verification focus
  • You are syncing docs to code without auditing completion claims

Inputs

  • Repository root
  • Plan or report files that declare completed tasks (e.g. project/build/*.md, project/changelog/plans/*.md)
  • Changelog index and entries (project/changelog/index.md, project/changelog/<type>/*.md, project/changelog/plans/ for completed plans)
  • Troubleshooting index and entries (project/troubleshooting/index.md, project/troubleshooting/<category>/*.md)
  • Relevant source files referenced in each task

Prioritization and Ordering

  • Use the shared rubric: ../00-Meta-Workflow/00-meta/severity-priority-rubric.md
  • Order work and flagged issues by descending urgency/importance: P0 → P1 → P2 → P3
  • Within the same priority, order by severity: S0 → S1 → S2 → S3
  • Output: Display all flagged issues in descending order of importance or urgency (most critical first)

Steps

Verification Workflow

         ┌─────────────────┐
         │  Identify plan  │
         │  files with     │
         │  "complete"     │
         └────────┬────────┘
                  │
                  ▼
┌───────────────────────────────────────────────┐
│         PARALLEL VERIFICATION AGENTS          │
├───────────────────────────────────────────────┤
│  ┌──────────┐  ┌──────────┐  ┌──────────┐     │
│  │ Agent A  │  │ Agent B  │  │ Agent C  │     │
│  │ (P0/S0)  │  │ (P1 sec) │  │ (P1 bug) │     │
│  └────┬─────┘  └────┬─────┘  └────┬─────┘     │
│       │             │             │           │
│       │             │             │           │
│       ▼             ▼             ▼           │
│  ┌──────────┐  ┌──────────┐  ┌──────────┐     │
│  │ Agent D  │  │ Agent E  │  │ Agent F  │     │
│  │ (P1 UX)  │  │ (P2/3)   │  │ (docs)   │     │
│  └────┬─────┘  └────┬─────┘  └────┬─────┘     │
│       │             │             │           │
│       └─────────────┼─────────────┘           │
│                     │                         │
│                     ▼                         │
│         ┌──────────────────┐                  │
│         │    Collect       │                  │
│         │    results       │                  │
│         └────────┬─────────┘                  │
└───────────────────────────────────────────────┘
                    │
                    ▼
       ┌────────────────────┐
       │  Mark ✅ vs Flag ⚠️ │
       │ (descending prior) │
       └──────────┬─────────┘
                  │
                  ▼
       ┌────────────────────┐
       │ Reconcile logs &   │
       │ docs (changelog,   │
       │ troubleshooting)   │
       └──────────┬─────────┘
                  │
                  ▼
       ┌────────────────────┐
       │ Output flagged     │
       │ issues (P0→P3)     │
       └────────────────────┘

Phase 1: Identify Sources of "Completed" Claims

  1. Locate plan and report files that declare completed tasks:
    • Scan project/build/ and project/changelog/plans/ for markdown files with checkboxes, "Complete", "✅" (green check mark), or "Implementation Verified"
    • Note file paths and section headings that list tasks and sub-tasks
  2. Extract claimed completions: For each file, list every task/sub-task that is marked complete (e.g. [✅], "COMPLETE", "Implementation Verified" with no "NOT COMPLETE" note). Use only ✅ (green check mark) for marking completed items—not "x", ✓, or other symbols—for consistency.

Phase 2: Verify Implementation in Code (Parallel Agents)

Use multiple parallel agents to verify implementation. Each agent should read the actual source files referenced in the task (file paths, line numbers) and confirm that the described fix or feature exists.

Suggested agent roles (spawn additional agents as needed). Each agent verifies a subset of tasks by reading code in parallel batches:

  • Agent A (P0 / critical): Verify all P0 and S0/S1 tasks — read the cited files, confirm the described code (e.g. structuredClone, ErrorBoundary usage, API key handling) is present and matches the claim
  • Agent B (P1 security / Electron): Verify security and Electron-related tasks — read desktop/main.ts, desktop/preload.ts, vite.config.ts, and any IPC/context-bridge usage; confirm removal or presence of handlers as claimed
  • Agent C (P1 bugs / hooks): Verify hook and concurrency fixes — read hooks/useSessions.ts, hooks/useHistory.ts, hooks/usePersistence.ts, hooks/useGeminiClient.ts at cited lines; confirm functional updates, batched reads, clone behavior
  • Agent D (P1 UX / components): Verify component-level fixes — read components/ErrorBoundary.tsx, ArtifactCard.tsx, SideDrawer.tsx, SessionHistory.tsx, CodeEditor.tsx at cited lines; confirm scroll logic, keyboard handlers, error boundaries
  • Agent E (P2 / refactors): Verify P2 and P3 items — read any files cited for "extract logic", "schema validation", "useMemo", regex consolidation; confirm implementation or document absence
  • Agent F (Docs / logs): Verify documentation and log claims — check project/changelog/, project/troubleshooting/, docs/ for entries that the plan says were updated; confirm they exist and match the described changes

Agents should batch-read files concurrently (e.g. read all files for their task subset in parallel) to maximize speed. Output per agent:

  • Task ID / heading and Claim (what the plan says is done)
  • Files read (paths and line ranges)
  • Verified? Yes / No / Partial
  • Evidence (exact code or doc snippet that confirms or contradicts)
  • Flag (if not done: "False completion", "Incomplete", "Not implemented", or "Docs not updated")

Phase 3: Mark Completed vs Flag False Reporting

  1. For each task/sub-task:
    • If verification shows the implementation is present and correct: mark with (green check mark) in the plan/report. Ensure checkboxes are [✅] and any "Implementation Verified" or "Verification" section reflects reality.
    • If verification shows the implementation is missing, partial, or incorrect: do not add a green check mark. Instead flag the item for the developer.
  2. Flagging convention:
    • False completion: Plan says complete but code/docs show no implementation
    • Incomplete: Only part of the task was done (e.g. proxy handlers added but IPC key handler still exposed)
    • Not implemented: Task marked done but cited file/line does not contain the described change
    • Docs not updated: Plan says "documentation updated" but changelog/troubleshooting/docs have no corresponding entry or the entry is wrong
  3. Collect all flagged issues and list them in descending order of importance/urgency (see Output Requirements).

Phase 4: Reconcile and Update Documentation and Logs

  1. Changelog: For each verified completion that is not yet reflected in project/changelog/, add or update an entry per project conventions (e.g. project/changelog/<type>/<yyyy-mm-dd>-<type>-<short-title>.md and a row in project/changelog/index.md). For false completions, do not add a changelog entry claiming the fix; optionally add an entry only when the developer actually implements the fix.
  2. Troubleshooting: If a task was about a bug or incident, ensure project/troubleshooting/ has an entry that matches the fix (or a note that it is still open). Update or add entries only for verified fixes. File into the appropriate category subfolder (build/, runtime/, data/, environment/, security/) and add a row at the top of project/troubleshooting/index.md.
  3. Plans-Completed: If a plan or implementation document is fully completed and should be archived:
    • Move the plan from project/plans/ or project/build/ to the appropriate category subfolder in project/plans-completed/ (implementation/, investigation/, migration/, review/, tooling/)
    • If no appropriate subfolder exists, create one with a descriptive name (kebab-case)
    • Add a row at the top of project/plans-completed/index.md with: Date, Category, Title, File path, Notes
    • Add a Type=plan row at the top of project/changelog/index.md referencing the completed plan file
  4. Related docs: Update docs/ (e.g. ARCHITECTURE, USER_MANUAL, OVERVIEW, TROUBLESHOOTING) so they do not contradict the verified state. Remove or correct any doc text that claims something is done when it is flagged as not done.
  5. plans/TODO.md: When tasks are completed, update plans/TODO.md (check off items or add follow-ups as needed).
  6. Plan/report file: Write back into the plan/report file:
    • on tasks and sub-tasks that were verified complete
    • Remove or replace completion markers from tasks that were flagged (leave as unchecked [ ] or add a "⚠ False completion" / "⚠ Incomplete" note). Do not use "x" or ✓ for completed; use ✅ (green check mark) only for consistency.

Phase 5: Produce Flagged Issues Report

  1. Single ordered list: "Flagged issues" in descending order of importance or urgency.
  2. Format each item: Priority (P0/P1/P2/P3), Severity (S0–S3), Task ID/heading, Flag type (False completion / Incomplete / Not implemented / Docs not updated), one-line summary, and file/line or doc reference.
  3. Placement: At the top of the workflow output or in a dedicated "Flagged issues" section so the developer sees the most critical items first.

Output Requirements

In the plan/report file

  • Completed tasks: Mark with (green check mark) only. Use [✅] for checkboxes. Do not use "x", ✓, or other symbols for completed items—use ✅ consistently. Keep "Implementation Verified" and "Verification" sections accurate.
  • Flagged tasks: Do not mark with ✅. Add a short note (e.g. "⚠ False completion" or "⚠ Incomplete — see verification") and leave checkboxes as [ ] or update status to "NOT COMPLETE" where applicable.

Flagged issues list (descending order)

Display all flagged issues in descending order of importance or urgency, for example:

## Flagged issues (descending order of importance/urgency)

1. **P0 / S1** — P1-1: Remove IPC API Key Exposure — **Incomplete.** Plan says "proxy handlers present" but `get-api-key` handler still exposed in `desktop/main.ts:292-294`. Renderer can still obtain raw key.
2. **P1 / S2** — Phase 2 Exit Criteria: "Documentation updated for web deployment" — **Docs not updated.** No changelog or docs entry found for web deployment requirements.
3. **P2 / S2** — P2-1: Schema Validation — **False completion.** Marked deferred but checklist item "Update docs" was checked; no doc change found.
…

Reconciled artifacts

  • Changelog: New or updated entries only for verified completions; index updated.
  • Troubleshooting: Entries match verified fixes; open issues clearly marked; filed in appropriate subdirectories.
  • Plans-Completed: Completed plans filed in appropriate category subdirectories (implementation/, investigation/, migration/, review/, tooling/ or custom); index updated with entries at top.
  • Docs: No claims that contradict verification (e.g. remove "API key is never sent to renderer" if P1-1 is still incomplete).

Acceptance Criteria

  • Every task/sub-task in scope that is marked "complete" in the plan has been verified against the codebase (and docs where relevant).
  • Verified completions are marked with ✅ (and [✅] where applicable); false or incomplete claims are flagged and not marked complete.
  • All flagged issues are listed in descending order of importance or urgency (P0→P3, S0→S3).
  • Changelog, troubleshooting, and related docs are reconciled with the verified state (no false claims in docs).
  • Parallel agents were used to verify implementation (multiple agents reading code in parallel batches).

Related Workflows

Notes

  • Parallel agents: Use as many agents as needed to cover P0–P3 and different areas (security, hooks, components, docs) so verification runs in parallel and finishes faster.
  • Evidence: Every "Verified" or "Flagged" conclusion must cite the actual file path and, where useful, line number or snippet.
  • Developer decides: Flagging an item does not mean you change the code; it means you surface it so the developer can decide to implement, defer, or re-scope.
  • One source of truth: After this workflow, the plan/report and the changelog/troubleshooting/docs should agree on what is actually done.