Skip to content

feat: advanced filter redesign with enhanced operators and nested groups #21

feat: advanced filter redesign with enhanced operators and nested groups

feat: advanced filter redesign with enhanced operators and nested groups #21

Triggered via push February 8, 2026 19:52
Status Failure
Total duration 1m 19s
Artifacts

test.yml

on: push
Matrix: Test & Verify Build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Test & Verify Build (20.x)
Process completed with exit code 1.
Test & Verify Build (18.x)
The strategy configuration was canceled because "test._20_x" failed
Test & Verify Build (18.x)
The operation was canceled.
Test & Verify Build (20.x)
Process completed with exit code 127.
Test & Verify Build (18.x)
Process completed with exit code 127.
Test & Verify Build (20.x)
Process completed with exit code 127.
Test & Verify Build (18.x)
Process completed with exit code 127.