Skip to content

add Normalizer

add Normalizer #108

Triggered via push September 29, 2025 05:35
Status Failure
Total duration 42s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (8.2)
Process completed with exit code 2.
test (8.3)
The operation was canceled.
test (8.3)
The strategy configuration was canceled because "test._8_2" failed
test (8.1)
The operation was canceled.
test (8.1)
The strategy configuration was canceled because "test._8_2" failed
test (8.4)
The operation was canceled.
test (8.4)
The strategy configuration was canceled because "test._8_2" failed