Skip to content

-vv tests

-vv tests #9

Triggered via push May 23, 2025 11:38
Status Failure
Total duration 33s
Artifacts

unit-tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (3.11)
Process completed with exit code 2.
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed