Skip to content

Commit 4880dc2

Browse files
InfoTech.io Botclaude
andcommitted
docs: Create Child #5 (Testing & Validation) stage plans - 7 stages defined
Created complete stage-level planning for Child #5: Stage Structure (7 stages, ~2.25 days): 1. Environment & Prerequisites (0.25d) - PAT_TOKEN verification, baseline 2. E2E Workflow Testing (0.75d) - Both workflows fully tested 3. Integration Testing (0.5d) - Repository dispatch, independence 4. UX Validation (0.25d) - Navigation, styling, responsive, cross-browser 5. Performance Validation (0.25d) - Build/load times, metrics 6. Reliability Testing (0.25d) - Failures, recovery, edge cases 7. Results Documentation (ongoing) - Issues, summary, production readiness Files Created: - 7 stage plan files (001-007-*.md) - detailed task descriptions - 7 progress template files (001-007-progress.md) - to be filled during execution - Updated design.md with complete 7-stage structure Design Updates: - Status: Ready to start (all prerequisites complete) - Duration: 2.25 days (was 2 days) - Dependencies updated (Children #3 and #4 now complete) - Timeline breakdown added - Stage dependencies documented Planning Approach: - Follows InfoTech.io issue-commit workflow - Each stage has plan + progress files - Stage 7 runs parallel (continuous documentation) - Clear deliverables and success criteria per stage - Organized sequence: Setup → E2E → Integration → UX → Performance → Reliability → Documentation Next: Execute Stage 1 (Environment & Prerequisites) Related: #2, #7 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
1 parent 5c7f093 commit 4880dc2

15 files changed

Lines changed: 2787 additions & 56 deletions
Lines changed: 208 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,208 @@
1+
# Stage 1: Test Environment & Prerequisites
2+
3+
**Child**: #5 - Testing & Validation
4+
**Epic**: #2 - Rebuild GitHub Pages Federation
5+
**Status**: ⏳ Pending
6+
**Estimated Duration**: 0.25 days (2 hours)
7+
8+
---
9+
10+
## 🎯 Stage Objective
11+
12+
Prepare and validate testing environment, verify all prerequisites from Child #4, and establish baseline for testing.
13+
14+
---
15+
16+
## 📋 Tasks
17+
18+
### Task 1: Verify PAT_TOKEN in Product Repositories
19+
20+
Check PAT_TOKEN secret exists in all 4 product repositories (deferred from Child #4).
21+
22+
**Repositories to check**:
23+
- info-tech-io/quiz
24+
- info-tech-io/hugo-templates
25+
- info-tech-io/web-terminal
26+
- info-tech-io/info-tech-cli
27+
28+
**Validation Method**:
29+
```bash
30+
# Use GitHub CLI to check secrets (if accessible)
31+
gh secret list --repo info-tech-io/quiz
32+
gh secret list --repo info-tech-io/hugo-templates
33+
gh secret list --repo info-tech-io/web-terminal
34+
gh secret list --repo info-tech-io/info-tech-cli
35+
```
36+
37+
**Expected Result**: PAT_TOKEN present in all 4 repositories
38+
39+
**Alternative**: If secrets not accessible, verify by checking notify-hub.yml workflows reference the secret
40+
41+
---
42+
43+
### Task 2: Check Workflow Permissions
44+
45+
Verify GitHub Actions workflows have correct permissions in hub repository.
46+
47+
**Checks**:
48+
1. Repository Settings → Actions → General
49+
2. Workflow permissions: Read and write permissions
50+
3. GitHub Pages deployment permissions
51+
4. Repository dispatch permissions
52+
53+
**Files to verify**:
54+
- `.github/workflows/deploy-corporate-incremental.yml` - permissions correct
55+
- `.github/workflows/deploy-docs-federation.yml` - permissions correct
56+
57+
**Expected Permissions**:
58+
```yaml
59+
permissions:
60+
contents: read
61+
pages: write
62+
id-token: write
63+
```
64+
65+
---
66+
67+
### Task 3: Validate Current Deployment State
68+
69+
Document current state of GitHub Pages as baseline for testing.
70+
71+
**URLs to check**:
72+
1. **Corporate Site**: https://info-tech-io.github.io/
73+
- Homepage accessible
74+
- All corporate pages functional
75+
- Navigation working
76+
77+
2. **Documentation Hub**: https://info-tech-io.github.io/docs/
78+
- Hub page accessible
79+
- 4 product cards present
80+
- Links functional
81+
82+
3. **Product Documentation** (all 4):
83+
- https://info-tech-io.github.io/docs/quiz/
84+
- https://info-tech-io.github.io/docs/hugo-templates/
85+
- https://info-tech-io.github.io/docs/web-terminal/
86+
- https://info-tech-io.github.io/docs/info-tech-cli/
87+
88+
**Data to collect**:
89+
- HTTP status codes (expect 200)
90+
- Page load times
91+
- Content presence
92+
- CSS loading status
93+
- Screenshots for baseline
94+
95+
---
96+
97+
### Task 4: Review Workflow Run History
98+
99+
Analyze recent workflow executions to establish performance baseline.
100+
101+
**Workflows to review**:
102+
1. `deploy-corporate-incremental.yml`
103+
- Last 5 runs
104+
- Success rate
105+
- Average duration
106+
- Common issues
107+
108+
2. `deploy-docs-federation.yml`
109+
- Last 5 runs (manual triggers)
110+
- Success rate
111+
- Average duration
112+
- Build log analysis
113+
114+
**Commands**:
115+
```bash
116+
# List recent runs
117+
gh run list --workflow=deploy-corporate-incremental.yml --limit 5
118+
gh run list --workflow=deploy-docs-federation.yml --limit 5
119+
120+
# View specific run details
121+
gh run view <run-id>
122+
```
123+
124+
---
125+
126+
### Task 5: Setup Test Tracking Structure
127+
128+
Initialize tracking for test execution and results.
129+
130+
**Create test tracking file**: `test-results.md`
131+
132+
**Template**:
133+
```markdown
134+
# Child #5: Testing & Validation Results
135+
136+
**Testing Period**: [Start] - [End]
137+
**Tester**: AI Agent + Human Review
138+
**Environment**: Production (info-tech-io.github.io)
139+
140+
## Test Summary
141+
142+
| Stage | Status | Pass/Fail | Issues Found |
143+
|-------|--------|-----------|--------------|
144+
| Stage 1: Environment | ⏳ | - | - |
145+
| Stage 2: E2E Testing | ⏳ | - | - |
146+
| Stage 3: Integration | ⏳ | - | - |
147+
| Stage 4: UX Validation | ⏳ | - | - |
148+
| Stage 5: Performance | ⏳ | - | - |
149+
| Stage 6: Reliability | ⏳ | - | - |
150+
| Stage 7: Documentation | ⏳ | - | - |
151+
152+
## Baseline Metrics
153+
154+
### URLs Status
155+
- Corporate: [Status]
156+
- Docs Hub: [Status]
157+
- Product Docs: [Status]
158+
159+
### Performance Baseline
160+
- Corporate build time: [Time]
161+
- Docs build time: [Time]
162+
- Page load times: [Data]
163+
164+
## Issues Discovered
165+
166+
[List of issues with links to GitHub issues]
167+
168+
## Recommendations
169+
170+
[Testing recommendations]
171+
```
172+
173+
---
174+
175+
## 🎯 Deliverables
176+
177+
- ✅ PAT_TOKEN verification report
178+
- ✅ Workflow permissions validation
179+
- ✅ Current deployment state documentation
180+
- ✅ Workflow history analysis
181+
- ✅ Test tracking structure initialized
182+
- ✅ Baseline metrics documented
183+
184+
---
185+
186+
## ✅ Verification Criteria
187+
188+
- [ ] PAT_TOKEN confirmed in all 4 product repos (or verification method documented)
189+
- [ ] Workflow permissions verified as correct
190+
- [ ] All URLs accessible (200 status)
191+
- [ ] Baseline metrics captured
192+
- [ ] Test tracking initialized
193+
- [ ] No blockers identified
194+
195+
---
196+
197+
## 📝 Notes
198+
199+
- If PAT_TOKEN not directly verifiable, document alternative verification
200+
- Take screenshots of current site state
201+
- Document any anomalies or issues discovered
202+
- This stage resolves items deferred from Child #4
203+
204+
---
205+
206+
**Created**: 2025-10-27
207+
**Status**: Ready to execute
208+
**Next**: Stage 2 - End-to-End Workflow Testing
Lines changed: 33 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,33 @@
1+
# Stage 1 Progress Report
2+
3+
**Status**: ⏳ Not started
4+
**Blocked By**: None (ready to start)
5+
**Started**: -
6+
**Completed**: -
7+
**Duration**: -
8+
9+
---
10+
11+
## Summary
12+
13+
Stage 1 has not been started yet.
14+
15+
## Tasks Status
16+
17+
See stage plan file (001-*.md) for task list.
18+
19+
All tasks: ⏳ Pending
20+
21+
## Deliverables
22+
23+
⏳ Not created yet
24+
25+
## Next Action
26+
27+
Wait for approval to begin testing
28+
29+
---
30+
31+
**Created**: 2025-10-27
32+
**Updated**: 2025-10-27
33+
**Status**: Awaiting execution

0 commit comments

Comments
 (0)