Skip to content

Commit 76c0306

Browse files
author
InfoTech.io Bot
committed
docs(issue-10): create design documentation and detailed stage plans
Issue #10: Fix incremental deployment logic in unified workflow Created comprehensive documentation structure: Design: - Problem statement and root cause analysis - Solution overview (4-stage approach) - Timeline: 1.5 days total Stage Plans: - Stage 1 (0.5d): Reproduce the Issue * Analyze production state * Review workflow artifacts * Attempt manual recovery * Reproduce incremental failure * Document failure mechanism - Stage 2 (0.25d): Fix Build Target Logic * Make determination explicit * Remove ambiguous fallbacks * Add validation and error handling * Pattern matching for event types - Stage 3 (0.25d): Enhance Merge Safety * Pre-merge validation * Post-merge integrity checks * Enhanced logging and warnings - Stage 4 (0.5d): Test & Verify Fix * Full deployment test * Incremental deployment tests * Error handling validation * 24-hour production monitoring Structure: - design.md: High-level solution approach - progress.md: Visual progress tracking (empty) - 00X-stage.md: Detailed plan for each stage - 00X-progress.md: Report for each stage (empty) Ready for Stage 1 implementation. Related: #10, Epic: #2
1 parent b0eb977 commit 76c0306

10 files changed

Lines changed: 1400 additions & 0 deletions

File tree

Lines changed: 30 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,30 @@
1+
# Stage 1 Progress Report: Reproduce the Issue
2+
3+
**Status**: ó Planned
4+
**Started**: -
5+
**Completed**: -
6+
7+
---
8+
9+
## Summary
10+
11+
Stage 1 not yet started.
12+
13+
**Objective**: >A?@>8725AB8 ?@>1;5<C 4;O B>G=>9 4803=>AB8:8.
14+
15+
---
16+
17+
## Completed Steps
18+
19+
None
20+
21+
---
22+
23+
## Next Steps
24+
25+
- Begin Step 1.1: Analyze Current Production State
26+
- Follow detailed plan in `001-reproduce-issue.md`
27+
28+
---
29+
30+
**Last Updated**: 2025-11-02

0 commit comments

Comments
 (0)