Skip to content

Integration tests use pytest #58

Integration tests use pytest

Integration tests use pytest #58

Triggered via pull request March 29, 2025 22:10
Status Failure
Total duration 36s
Artifacts

qa.yaml

on: pull_request
Matrix: Run QA checks
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Run QA checks (3.11)
Process completed with exit code 1.
Run QA checks (3.12)
The operation was canceled.
Run QA checks (3.12)
The strategy configuration was canceled because "qa._3_11" failed
Run QA checks (3.13)
The operation was canceled.
Run QA checks (3.13)
The strategy configuration was canceled because "qa._3_11" failed