Skip to content

Latest commit

 

History

History
47 lines (41 loc) · 1.06 KB

File metadata and controls

47 lines (41 loc) · 1.06 KB

NYTF Safra Hall - Reference Notes

Edmond J. Safra Plaza 36 Battery Place New York, NY 10280

Crew/Staff entrance around the back, next to the garage door

Seats

  • 357

Cable Lengths & Paths

  • from rack position to FOH should be 100' not 150'
  • cable path from service to rack harmony position: 75'
  • build goal post for HR vestibule cable swags

Quirks

  • minimum 30" clearance around service connect

Array Calc & MAPP 3D Coordinates (X,Y,Z)

  • Stage: 49' x 24.57'
    • P1: -24.57, 22.37, 0
    • P2: 0, 22.37, 0
    • P3: 0, -26.63, 0
    • P4: -24.57, -26.63, 0
  • Front Orchestra: 49' x 8'
    • P1: 0, 22.37, 0
    • P2: 8, 22.37, 0
    • P3: 8, -26.63, 0
    • P4: 0, -26.63, 0
  • Main Orchestra: 50.5' x 28'
    • P1: 8, 23.12, 0
    • P2: 36, 23.12, 4
    • P3: 36, -27.38, 4
    • P4: 8, -27.38, 0
  • Rear Entry: 50.5' x 6.42'
    • P1: 36, 23.12, 4
    • P2: 42.42, 23.12, 4
    • P3: 42.42, -27.38, 4
    • P4: 36, -27.38. 4
  • Rear Orchestra: 50.5' x 22.6'
    • P1: 42.42, 23.12, 4
    • P2: 65.02, 23.12, 12.2
    • P3: 65.02, -27.38, 12.2
    • P4: 42.42, -27.38, 4

Food, Drink, Coffee

put nearby eatery info here