Skip to content

Latest commit

 

History

History
240 lines (142 loc) · 9.18 KB

File metadata and controls

240 lines (142 loc) · 9.18 KB
About stdlib...

We believe in a future in which the web is a preferred environment for numerical computation. To help realize this future, we've built stdlib. stdlib is a standard library, with an emphasis on numerical and scientific computation, written in JavaScript (and C) for execution in browsers and in Node.js.

The library is fully decomposable, being architected in such a way that you can swap out and mix and match APIs and functionality to cater to your exact preferences and use cases.

When you use stdlib, you can be absolutely certain that you are using the most thorough, rigorous, well-written, studied, documented, tested, measured, and high-quality code out there.

To join us in bringing numerical computing to the web, get started by checking us out on GitHub, and please consider financially supporting stdlib. We greatly appreciate your continued support!

nullaryLoopOrder

NPM version Build Status Coverage Status

Reorder ndarray dimensions and associated strides for loop interchange.

Installation

npm install @stdlib/ndarray-base-nullary-loop-interchange-order

Alternatively,

  • To load the package in a website via a script tag without installation and bundlers, use the ES Module available on the esm branch (see README).
  • If you are using Deno, visit the deno branch (see README for usage intructions).
  • For use in Observable, or in browser/node environments, use the Universal Module Definition (UMD) build available on the umd branch (see README).

The branches.md file summarizes the available branches and displays a diagram illustrating their relationships.

To view installation and usage instructions specific to each branch build, be sure to explicitly navigate to the respective README files on each branch, as linked to above.

Usage

var nullaryLoopOrder = require( '@stdlib/ndarray-base-nullary-loop-interchange-order' );

nullaryLoopOrder( shape, stridesX )

Reorders ndarray dimensions and associated strides for loop interchange.

// Define an array shape:
var shape = [ 2, 2 ];

// Define array strides:
var stridesX = [ 2, 1 ]; // row-major

// Resolve the loop interchange order:
var o = nullaryLoopOrder( shape, stridesX );
// returns {...}

The function returns an object having the following properties:

  • sh: ordered dimensions.
  • sx: array strides sorted in loop order.
  • idx: dimension indices sorted in loop order.

For all returned arrays, the first element corresponds to the innermost loop, and the last element corresponds to the outermost loop.

Notes

  • When iterating over the elements of a multi-dimensional array, accessing elements which are closer in memory can improve performance. To this end, loop interchange is a technique used in loop nest optimization to improve locality of reference and take advantage of CPU cache.

    The purpose of this function is to order ndarray dimensions according to the magnitude of array strides. By using the ordered dimensions and associated strides, one can construct nested loops (one for each dimension) such that the innermost loop iterates over the dimension in which array elements are closest in memory and the outermost loop iterates over the dimension in which array elements are farthest apart in memory. As a consequence, element iteration is optimized to minimize cache misses and ensure locality of reference.

Examples

var array = require( '@stdlib/ndarray-array' );
var loopOrder = require( '@stdlib/ndarray-base-nullary-loop-interchange-order' );

// Create an ndarray:
var x = array( [ [ 1, 2 ], [ 3, 4 ] ] );

// Resolve loop interchange data:
var o = loopOrder( x.shape, x.strides );
// returns {...}

console.log( o );

Notice

This package is part of stdlib, a standard library for JavaScript and Node.js, with an emphasis on numerical and scientific computing. The library provides a collection of robust, high performance libraries for mathematics, statistics, streams, utilities, and more.

For more information on the project, filing bug reports and feature requests, and guidance on how to develop stdlib, see the main project repository.

Community

Chat


License

See LICENSE.

Copyright

Copyright © 2016-2026. The Stdlib Authors.