Skip to content

Latest commit

 

History

History
63 lines (34 loc) · 1.58 KB

File metadata and controls

63 lines (34 loc) · 1.58 KB

CHANGELOG

Package changelog.

0.1.1 (2026-02-08)

No changes reported for this release.

0.1.0 (2026-01-31)

Features

Commits

Details
  • 7b5a1b5 - test: add test case for sx (by Philipp Burckhardt)
  • df82f00 - docs: fix require path (by Philipp Burckhardt)
  • 016b07f - refactor: rename/reorder parameters (by Athan Reines)
  • f40ccb7 - feat: add ndarray/base/ternary-loop-interchange-order (#9499) (by Muhammad Haris, Athan Reines)

Contributors

A total of 3 people contributed to this release. Thank you to the following contributors:

  • Athan Reines
  • Muhammad Haris
  • Philipp Burckhardt