Skip to content

Add powerpc64 and mips32 architecture support #553

Add powerpc64 and mips32 architecture support

Add powerpc64 and mips32 architecture support #553

Triggered via pull request January 21, 2026 10:00
Status Failure
Total duration 31s
Artifacts

main.yml

on: pull_request
Rustfmt
9s
Rustfmt
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

23 errors
Test (mipsel-linux, nightly-2025-10-23)
Process completed with exit code 1.
Test (mipsel-linux, 1.88)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (mipsel-linux, 1.88)
Process completed with exit code 1.
Test (riscv64-linux, 1.88)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (riscv64-linux, 1.88)
The operation was canceled.
Test (riscv64-linux, nightly-2025-10-23)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (riscv64-linux, nightly-2025-10-23)
The operation was canceled.
Test (aarch64-linux, nightly-2025-10-23)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (aarch64-linux, nightly-2025-10-23)
The operation was canceled.
Test (i686-linux, nightly-2025-10-23)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (i686-linux, nightly-2025-10-23)
The operation was canceled.
Test (aarch64-linux, 1.88)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (aarch64-linux, 1.88)
The operation was canceled.
Test (ppc64le-linux, nightly-2025-10-23)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (ppc64le-linux, nightly-2025-10-23)
The operation was canceled.
Test (ubuntu, 1.88)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (ubuntu, 1.88)
The operation was canceled.
Test (i686-linux, 1.88)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (i686-linux, 1.88)
The operation was canceled.
Test (ppc64le-linux, 1.88)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (ppc64le-linux, 1.88)
The operation was canceled.
Test (ubuntu, nightly-2025-10-23)
The strategy configuration was canceled because "test.mipsel-linux_nightly-2025" failed
Test (ubuntu, nightly-2025-10-23)
The operation was canceled.