Skip to content

Commit 933672f

Browse files
committed
pcb: revision 2
- follow sch in replacing electrolytics with ceramic SMT caps - move J6 (primary USB KBD connector) left to reduce the proximity of its pads to the shielding of J8 (PS/2 connector) - move R9, R10 left to make space for J6 - move BASIC Engine logo down a bit - update date and revision silkscreen
1 parent 3a9770a commit 933672f

1 file changed

Lines changed: 357 additions & 336 deletions

File tree

0 commit comments

Comments
 (0)