Skip to content

Update deps

Update deps #168

Triggered via pull request January 15, 2026 01:40
Status Failure
Total duration 1m 40s
Artifacts

tests.yml

on: pull_request
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Tests (8.3)
Process completed with exit code 2.
Tests (8.2)
The strategy configuration was canceled because "lint._8_3" failed
Tests (8.2)
The operation was canceled.
Tests (8.1)
The strategy configuration was canceled because "lint._8_3" failed
Tests (8.1)
The operation was canceled.