Move OWASP Top 10:2025 assessment to plans/done (#500)#1014
Merged
Conversation
All five remediation gaps are now merged (#1001 rate limiting, #1002 security headers/CSP, #983 NuGet lock files, #984 expression security review, #1013 security audit events), completing the assessment's remediation programme. Move the assessment document to plans/done per the plan filing convention, set its status to Done with the deferred-items note, and repoint the three engineering documents that referenced the plans/doing path. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
All five remediation gaps from the OWASP Top 10:2025 assessment are now merged (#1001, #1002, #983, #984, #1013). This moves the assessment document to
engineering/plans/done/per the plan filing convention, sets its status to Done (with the deferred tamper-evidence and stage-two CSP notes), and repoints the three engineering docs that linked to theplans/doing/path. Completes the final acceptance criterion of #500.Docs: n/a - internal engineering plan filing only; no user-facing change.
🤖 Generated with Claude Code