Skip to content

Move OWASP Top 10:2025 assessment to plans/done (#500)#1014

Merged
JayVDZ merged 1 commit into
mainfrom
feature/owasp-assessment-close-out
Jul 14, 2026
Merged

Move OWASP Top 10:2025 assessment to plans/done (#500)#1014
JayVDZ merged 1 commit into
mainfrom
feature/owasp-assessment-close-out

Conversation

@JayVDZ

@JayVDZ JayVDZ commented Jul 14, 2026

Copy link
Copy Markdown
Contributor

All five remediation gaps from the OWASP Top 10:2025 assessment are now merged (#1001, #1002, #983, #984, #1013). This moves the assessment document to engineering/plans/done/ per the plan filing convention, sets its status to Done (with the deferred tamper-evidence and stage-two CSP notes), and repoints the three engineering docs that linked to the plans/doing/ path. Completes the final acceptance criterion of #500.

Docs: n/a - internal engineering plan filing only; no user-facing change.

🤖 Generated with Claude Code

All five remediation gaps are now merged (#1001 rate limiting, #1002
security headers/CSP, #983 NuGet lock files, #984 expression security
review, #1013 security audit events), completing the assessment's
remediation programme. Move the assessment document to plans/done per the
plan filing convention, set its status to Done with the deferred-items
note, and repoint the three engineering documents that referenced the
plans/doing path.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@JayVDZ
JayVDZ merged commit 0ae7ec5 into main Jul 14, 2026
18 checks passed
@JayVDZ
JayVDZ deleted the feature/owasp-assessment-close-out branch July 14, 2026 16:37
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant