Original file line number Diff line number Diff line change
Expand Up @@ -4,13 +4,13 @@ Enterprise hardening and future phases. This document is the architectural refer

> **Document version:** 1.0 — March 2026
> **Current platform:** Actools v11.0
> **Status:** All Phases 1–4 complete
> **Status:** Phase 1 (modular architecture) shipped and live; Phases 2–4 exist as drafted, quarantined design seeds (in experimental/, not in the live install); Phase 4.5 (production-readiness hardening) in progress.

---

## Overview

The platform has progressed from a monolithic v9.2 installer to a v11.0 modular platform with 32 modular components, automated tests, CI/CD pipeline, self-healing health checks, observability, preview environments, zero-downtime migrations, and a development assistant.
The platform has progressed from a monolithic v9.2 installer to a v11.0 modular platform of 6 live modules (`audit backup db drupal host stack`) plus 7 quarantined experimental seeds (in `experimental/`), a 236-test suite across 24 bats files, and a CI/CD pipeline. Observability, preview environments, and the development assistant are experimental design seeds (in `experimental/`, not in the default install); the earlier `health` self-healing and `migrate` modules were removed during cleanup.

This document covers two architectural directions:

Expand All @@ -19,28 +19,47 @@ This document covers two architectural directions:

---

## Vocabulary — what "Phase" means here

"Phase" spans two unrelated axes in this codebase; this note is canonical.

**Product-roadmap phases** (feature waves):
- **Phase 1** — Modular architecture (the v9.2→v11.0 modular refactor). **Shipped/live.**
- **Phase 2** — Observability. *Drafted, quarantined in `experimental/`; not in the default install.*
- **Phase 3** — Developer platform (preview environments, CI/CD, migrations). *CI/CD is live; preview is experimental; the migrations module was removed.*
- **Phase 4** — AI-native assistant. *Drafted, quarantined in `experimental/`; not shipped.*
- **Phase 4.5** — Production-readiness hardening (this program). **In progress.**
- **Phase 5** — Post-4.5 deferrals: automated failover, MariaDB Galera, and the reconcile-or-delete of unwired superseded files.

**Process / program tracking** (how the work is run):
- **Phase 0 / `P0-*`** — the modularization *program* recorded in `docs/runbooks/PHASE0_LEDGER.md`. P0-* delivered the **Phase 1 "Modular architecture"** product milestone above (same work, two framings).
- **Tracks C / D / V / E** — the Phase 4.5 program's work tracks (cleanup / doc-truth / verification / build).
- **"Item N"** in shipped code comments (e.g. `backup/* — "Phase 4.5 Item 2"`) is the same as the program's **E-roster** items: Item 2 ≈ E2/E3 (encrypted backups, binlog/PITR), Item 3 ≈ Cloudflare tunnel, Item 4 ≈ RBAC. The authoritative live-vs-experimental map is `architecture/runtime-authority-map.md`.

---

## Part 1 — Phase 4.5: Enterprise Hardening

### What "Enterprise Grade" Actually Means

Enterprise grade is not a feature list. It is a set of operational guarantees:
Enterprise grade is not a feature list. It is a set of operational *objectives* — the targets Phase 4.5 is pursuing, not capabilities the current system already guarantees:

- **RTO < 15 minutes** — Recovery Time Objective. If the server dies, you are back online within 15 minutes.
- **RPO < 1 hour** — Recovery Point Objective. You lose at most 1 hour of data.
- **99.9% uptime** — No more than 8.7 hours downtime per year.
- **Audit trail** — Every action is logged, timestamped, and attributable.
- **Multi-user access control** — Team members have appropriate access, not shared root.
- **RTO < 15 minutes** — Recovery Time Objective: the target for how quickly service is restored after the server dies.
- **RPO < 1 hour** — Recovery Point Objective: the target ceiling on data lost in a failure.
- **99.9% uptime** — the availability target (no more than ~8.7 hours of downtime per year).
- **Audit trail** — every action logged, timestamped, and attributable.
- **Multi-user access control** — team members have appropriate access, not shared root.
- **Compliance-ready** — GDPR, SOC2, ISO27001 requirements met at the infrastructure level.

The current v11.0 system meets about 60% of these requirements. Phase 4.5 closes the remaining 40%.
The current v11.0 system meets about 60% of these requirements. Phase 4.5 closes the remaining 40%. Committed operational numbers (RTO, RPO, failover time) are published only from a measured rehearsal — at 2× the measured value — not asserted in advance.

---

### 5A — High Availability & Disaster Recovery

**Current state:** Single Hetzner server. If it goes down, your site goes down.

**Phase 4.5 target:** Automated failover to a standby server within 5 minutes.
**Phase 4.5 target:** Manual disaster recovery — DNA snapshot + operator-run resurrect to a standby server. (Automated failover is Phase 5; any failover-time figure is published only from a measured rehearsal.)

#### Implementation

Expand Down Expand Up @@ -165,7 +184,7 @@ sync_binlog = 1
actools migrate --point-in-time "2026-03-26 14:30:00" prod
```

#### Phase 4.5: MariaDB Galera Cluster (3 nodes)
#### Phase 5: MariaDB Galera Cluster (3 nodes)

Galera provides synchronous multi-master replication. All 3 nodes accept writes simultaneously.

Expand Down Expand Up @@ -391,8 +410,8 @@ EOF
| MariaDB SSL | Medium | 1 day | Encryption in transit |
| Automated security scanning | Medium | 1 day | Compliance |
| GDPR tools | Medium | 2 days | Regulatory compliance |
| Galera clustering | Low | 1 week | True HA (Phase 5 prep) |
| DNA/resurrection system | High | 3 days | <15min RTO |
| Galera clustering | Low | 1 week | True HA (Phase 5) |
| DNA/resurrection system (manual) | High | 3 days | Disaster recovery |
| Audit trail | Medium | 1 day | Compliance |

**Phase 4.5 estimated duration:** Several weeks of focused architectural work.
Expand Down Expand Up @@ -589,18 +608,18 @@ actools cdn enable --provider=cloudflare
## The Complete Roadmap at a Glance

```
NOW (v11.0)
├── ✅ Phase 1: Modular architecture (32 modules, 21 tests)
├── Phase 2: Observability (Grafana, health checks, cost-optimize)
├── Phase 3: Developer platform (preview envs, CI/CD, migrations)
├── Phase 4: AI-native dev environment (Ollama, code-aware)
NOW (v11.0 — live install)
├── ✅ Phase 1: Modular architecture — 6 live modules, 236 tests, CI/CD [SHIPPED]
├── 🧪 Phase 2: Observability (Grafana/exporters) — experimental, optional, NOT in the default install
├── Phase 3: Developer platform — CI/CD live; preview envs experimental (in experimental/); migrations module removed
├── 🧪 Phase 4: AI-native assistant (Ollama) — experimental (in experimental/), not shipped
├── 🔜 Phase 4.5: Enterprise hardening (4-6 weeks)
│ ├── Encrypted backups + PITR
│ ├── Zero-trust networking (Cloudflare Tunnel)
│ ├── Multi-user RBAC + audit trail
│ ├── MariaDB SSL
│ ├── DNA/resurrection system (RTO < 15min)
│ ├── DNA/resurrection system (manual; failover time TBD by rehearsal)
│ └── GDPR compliance tools
├── 🔮 Phase 5: Multi-tenancy (Month 3–5)
Expand Down