You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
chore: CI workflow (lint, typecheck, tests, coverage >=75%, architecture) #9
Merged via #44 (workflow restore) + #45 (frontend-jobs deferral) + #46 (placeholder test). All six backend CI jobs green on develop: Lint & Format, Type Check, Unit tests, Coverage, Architecture, Pre-commit. Frontend jobs (Frontend Build, Frontend Quality) ship in #21 alongside frontend/package.json.
Activity
chore: CI workflow (lint, typecheck, tests, coverage >=75%, architect…
fix: dereference astral-sh/setup-uv annotated tag to commit SHA (#40)
chore: restore full ci.yml with setup-uv v8 (fixes startup failure) (#44
chore: placeholder test so pytest does not exit 5 on empty scaffold (#46
constk commentedon Apr 26, 2026
Merged via #44 (workflow restore) + #45 (frontend-jobs deferral) + #46 (placeholder test). All six backend CI jobs green on develop: Lint & Format, Type Check, Unit tests, Coverage, Architecture, Pre-commit. Frontend jobs (Frontend Build, Frontend Quality) ship in #21 alongside frontend/package.json.