Skip to content

update safety analysis template#74

Open
RolandJentschETAS wants to merge 3 commits into
mainfrom
update_safety_analysis
Open

update safety analysis template#74
RolandJentschETAS wants to merge 3 commits into
mainfrom
update_safety_analysis

Conversation

@RolandJentschETAS
Copy link
Copy Markdown
Contributor

update safety analysis template to newest version

@github-actions
Copy link
Copy Markdown

github-actions Bot commented May 20, 2026

License Check Results

🚀 The license check job ran with the Bazel command:

bazel run --lockfile_mode=error //:license-check

Status: ⚠️ Needs Review

Click to expand output
[License Check Output]
Extracting Bazel installation...
Starting local Bazel server (8.3.0) and connecting to it...
INFO: Invocation ID: 02f9f6e0-f881-4106-848c-9688dcff156c
Computing main repo mapping: 
Computing main repo mapping: 
Computing main repo mapping: 
Computing main repo mapping: 
Loading: 
Loading: 0 packages loaded
Loading: 0 packages loaded
Loading: 0 packages loaded
    currently loading: 
Loading: 0 packages loaded
    currently loading: 
Loading: 0 packages loaded
    currently loading: 
Loading: 0 packages loaded
    currently loading: 
Analyzing: target //:license-check (1 packages loaded, 0 targets configured)
Analyzing: target //:license-check (1 packages loaded, 0 targets configured)

Analyzing: target //:license-check (33 packages loaded, 10 targets configured)

Analyzing: target //:license-check (78 packages loaded, 10 targets configured)

Analyzing: target //:license-check (87 packages loaded, 10 targets configured)

Analyzing: target //:license-check (135 packages loaded, 2550 targets configured)

Analyzing: target //:license-check (154 packages loaded, 5384 targets configured)

Analyzing: target //:license-check (154 packages loaded, 5384 targets configured)

Analyzing: target //:license-check (154 packages loaded, 5384 targets configured)

Analyzing: target //:license-check (154 packages loaded, 5384 targets configured)

Analyzing: target //:license-check (157 packages loaded, 7269 targets configured)

Analyzing: target //:license-check (157 packages loaded, 7269 targets configured)

Analyzing: target //:license-check (159 packages loaded, 7424 targets configured)

Analyzing: target //:license-check (160 packages loaded, 10026 targets configured)

Analyzing: target //:license-check (161 packages loaded, 10034 targets configured)

Analyzing: target //:license-check (161 packages loaded, 10034 targets configured)

Analyzing: target //:license-check (161 packages loaded, 10034 targets configured)

Analyzing: target //:license-check (161 packages loaded, 10034 targets configured)

Analyzing: target //:license-check (161 packages loaded, 10034 targets configured)

Analyzing: target //:license-check (162 packages loaded, 10154 targets configured)

Analyzing: target //:license-check (162 packages loaded, 10154 targets configured)

INFO: Analyzed target //:license-check (163 packages loaded, 11733 targets configured).
[12 / 16] JavaToolchainCompileClasses external/rules_java+/toolchains/platformclasspath_classes; 0s disk-cache
INFO: From Generating Dash formatted dependency file ...:
INFO: Successfully converted 2 packages from Cargo.lock to bazel-out/k8-fastbuild/bin/formatted.txt
[14 / 16] JavaToolchainCompileBootClasspath external/rules_java+/toolchains/platformclasspath.jar; 0s disk-cache, processwrapper-sandbox
INFO: Found 1 target...
Target //:license.check.license_check up-to-date:
  bazel-bin/license.check.license_check
  bazel-bin/license.check.license_check.jar
[16 / 16] no actions running
INFO: Elapsed time: 214.397s, Critical Path: 2.44s
INFO: 16 processes: 12 internal, 3 processwrapper-sandbox, 1 worker.
INFO: Build completed successfully, 16 total actions
INFO: Running command line: bazel-bin/license.check.license_check ./formatted.txt <args omitted>
usage: org.eclipse.dash.licenses.cli.Main [-batch <int>] [-cd <url>]
       [-confidence <int>] [-ef <url>] [-excludeSources <sources>] [-help] [-lic
       <url>] [-project <shortname>] [-repo <url>] [-review] [-summary <file>]
       [-timeout <seconds>] [-token <token>]

masc2023
masc2023 previously approved these changes May 20, 2026
@github-actions
Copy link
Copy Markdown

The created documentation from the pull request is available at: docu-html

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Status: Backlog

Development

Successfully merging this pull request may close these issues.

2 participants