First Workshop on Safety Assessment
- The date is fixed for the 18-February-2014 to 19-February-2014
The workshop is hosted by AEbt and takes place at:
Angewandte Eisenbahntechnik GmbH
Adam-Klein Straße 28
90429 Nürnberg
Please register in the participation doodle.
#Prerequisites for The Workshop
- D 4.2.1
- D 4.2.2
- D 4.2.3
- First Internal Assessment Report
- 13:00 - 13:15 Welcome - Norbert Schäfer confirmed
- 13:15 - 13:30 Introduction to the goal of the internal assessment - Marc Behrens, DLR
- 13:30 - 13:45 Introduction into safety activities inside openETCS
- 13:30 - 13:45 Safety Case (D4.3.1 - Safety inside openETCS) - Jan Welte, TU-BS
- 13:45 - 14:45 Block on System, Safety Analysis and Process
- 13:45 - 14:15 System Analysis (also known as SSRS) current state overview - Jan Welte, TU-BS confirmed
-
Safety Analysis current state overview - Jan Welte, TU-BS _confirmed_ - 14:15 - 15:15 openETCS complete process + Discussion (Bernd ) confirmed
- 15:15 - 15:30 Break
- 15:30 - 16:10 Block presenting the documents assessed
- 15:30 - 16:10 QA- Plan and quality assurance process + Discussion - Izaskun de la Torre confirmed
- 16:10 - 16:45 Internal Assessment (Task performed) + Keynote - Frédérique Vallée + Anthony Faucogney + Norbert Schäfer (All4Tec) confirmed
- 16:45 - 16:50 Break
- 16:50 - 18:20 Internal Assessment Decision Session + Discussion - Marc Behrens
- Time for check-in
- 19:00 - Dinner, drinks and networking (Restaurant reserved, to pay for oneself) confirmed @Lederer Kulturbrauerei, Sielstr. 12, 90429 Nürnberg
- 09:00 - 09:20 Round Table Introduction - Frédérique Vallée, All4Tec - confirmed
- 09:20 - 09:45 Round Table Topic Methods and Techniques Tables of CENELEC & Quality Plan/ Safety Plan contents - Ralph Pinger, Izaskun de la Torre and Jan Welte
- 09:45 - 10:10 Round Table Topic Interface between the WPs - Hardi Hungar
- 10:10 - 10:35 Round Table Topic How to implement SCRUM like agile development scheme with meeting EN50128:2011 goals in an Eclipse setting - Klaus Rüdiger HAse
- 10:35 - 10:50 - Break
- 10:50 - 11:15 Round Table Topic Traceability down to Goal Structured Notation - Jan Welte
- 11:15 - 11:40 Round Table Topic Safety within the code - Jens Gerlach
- 11:40 - 12:05 Round Table Topic Train Localization by Satellite - Hans-Jörg Manz
- 12:05 - 13:30 - Lunch Break
- Preparing the schedule of the WP4 tasks related to safety
- 13:30 - 14:00 Identifying activities and leaders for the activities
- 14:00 - 14:15 Discussion
- 14:15 - 14:30 Feedback from external parties - (tbd) + Discussion confirmed
- 14:30 - 14:45 Planning the next Internal Assessment Workshop (Timeline for Invitation and Planning) - Anthony Faucogney, All4Tec - not confirmed
- 14:45 - 15:00 Outlook of the Internal Assessment and Roundup of the Workshop - Marc Behrens, DLR - confimed
The purpose of the openETCS project is to develop an integrated modelling, development, validation and testing framework for leveraging the cost-efficient and reliable implementation of ETCS. The framework will provide a holistic tool chain across the whole development process of ETCS software. The tool chain will support the formal specification and verification of the ETCS system requirements, the automatic and ETCS compliant code generation and validation, and the model-based test case generation and execution.
openETCS will utilize "Open Standards" on all levels, including hardware and software specification, interface definition, design tools, verification and validation procedures and last but not least embedded control software. The open source concept provides for a neutral and formal method based "correct" functioning reference device.
Following the paradigm of agile development, openETCS has completed a first cycle including verification by the end of 2013.
To ensure the compliance of the development with the relevant regulations (e.g. CENELEC EN 50128), the project has set up an internal assessment activitity, which is to evaluate the approach in technical and organisational respect. The focus of the meeting (Feb 18 and 19) is a review of the current state of the project, and to define the strategy to guide it to successfully achieve its goals.