Skip to content

DO NOT MERGE: proof-pack negative control b (b-missing-check) - #105

Draft
romiluz13 wants to merge 2 commits into
integration/m1-20261018from
m1/control-b-missing-check
Draft

romiluz13 wants to merge 2 commits into
integration/m1-20261018from
m1/control-b-missing-check

Conversation

@romiluz13

Copy link
Copy Markdown
Owner

Negative control for #93. Do not merge. This deliberately breaks the proof-pack gate to prove the gate goes red.

  • Base: integration/m1-20261018 at 246294d (green run 39164000728).
  • Change: one patch, b-missing-check.
  • Expected: the API contract proof-pack (keyed MongoDB) job fails, with ##[error]proof-pack verdict lacks passing required checks: relevanceReport in its log.

Rom decides whether to close this PR and remove the branch.

🤖 Generated with Claude Code

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant