Skip to content

fix(logs): keep trace secret projection from blocking the event loop - #9305

Merged
waleedlatif1 merged 2 commits into
stagingfrom
fix/v2-logs-trace-projection-stall
Oct 22, 2026
Merged

waleedlatif1 merged 2 commits into
stagingfrom
fix/v2-logs-trace-projection-stall

fix(logs): check the projection slice at every structure node

d8a779e
Select commit
Loading
Failed to load commit list.
Vercel / Vercel Preview Comments succeeded Oct 22, 2026 in 0s

✅ No unresolved feedback

💬 0 unresolved, 0 resolved.