docs(2-bm): home the energy-cal rotary-stage conflict in STAGE-5 (ENERGY-7 cross-link)#303

Merged
xmap merged 1 commit into
mainfrom
worktree-2bm-stage5-xlink
Jun 22, 2026
Merged

docs(2-bm): home the energy-cal rotary-stage conflict in STAGE-5 (ENERGY-7 cross-link)#303
xmap merged 1 commit into
mainfrom
worktree-2bm-stage5-xlink

Conversation

@xmap

@xmap xmap commented Jun 22, 2026

Copy link
Copy Markdown
Owner

Follow-up to the ENERGY-7 fold (#300), reconciling the rotary-stage discrepancy you flagged.

Why we don't just adopt the staff's "150MP"

The ENERGY-7 answer (#256) says the channel-cut crystal is rocked on an ABRS-150MP. But the installed sample rotary's identity is anchored hard: a serial-numbered ABRS-250MP-M-AS (S/N 146853-A-1-1-X, drawing 630C2125), which the same staff confirmed in STAGE-3 (#164) — explicitly "corrects the ABS typo." The ABRS-150MP is a real stage, but it's the documented swap-kit alternate (item_050: 250MP installed + 150MP + an ABS2000 spindle), not the one in beam.

So "150MP" is either a slip for the installed 250MP, or evidence that the 150MP is genuinely mounted for energy-cal — which is a kit swap, and that's exactly the open STAGE-5 question. You don't repaint a serial-numbered asset's model on a one-line side-mention.

What this does

  • Folds the stage-model conflict into STAGE-5 (the rotary-kit-swap question), where it belongs, with the serial-number context.
  • Slims ENERGY-7 to its crystal-only residuals (explicit Si(220) + re-run cadence).

Pure docs; mkdocs --strict clean.

🤖 Generated with Claude Code

…RGY-7 cross-link)

The ENERGY-7 answer (#256) named the channel-cut crystal's rocking stage
as an ABRS-150MP, which conflicts with the installed sample rotary: a
serial-numbered ABRS-250MP-M-AS (S/N 146853-A-1-1-X, confirmed in
STAGE-3 / #164). That is not an energy-calibration detail, it is evidence
bearing on STAGE-5, the open rotary-kit-swap question (250MP installed vs
the 150MP / spindle swap-kit alternatives, item_050).

So this folds the stage-model conflict into STAGE-5 (where the rotary
identity / kit-swap question lives) rather than leaving it as a disconnected
ENERGY-7 residual: either the 150MP is genuinely mounted for energy
calibration (a real kit swap) or it is a slip for the installed 250MP.
ENERGY-7 is slimmed to its crystal-only residuals (explicit Si(220) and
re-run cadence).

Why not just adopt the 150MP: the installed rotary's identity is anchored
to a serial number + drawing + an explicit staff "it is a 250MP (corrects
the ABS typo)" in STAGE-3; you do not repaint a serial-numbered asset's
model on a one-line side-mention, especially given this stage's documented
typo history.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
@xmap xmap enabled auto-merge (squash) June 22, 2026 06:45
@github-actions

Copy link
Copy Markdown

Coverage report

This PR does not seem to contain any modification to coverable code.

@xmap xmap merged commit f020797 into main Jun 22, 2026
16 checks passed
@xmap xmap deleted the worktree-2bm-stage5-xlink branch June 22, 2026 06:56
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant